Home / 2016 / October (Page 2)

Back to the yard…

So I have a few other projects I wanted to try on this year, and I needed the material for them and I figured it’d be no harm to have some extra on hand in case I make a total dog’s breakfast of the cot’s steambending, so it was back to Quinns today…

2016-10-28-12-28-52a 2016-10-28-10-42-48a 2016-10-28-10-42-32a

So much fun stuff in this place 😀 And apparently they’d seen the photos from the last day and liked them, so Hi John and Paul if you’re reading.

Paul did his usual grand job of making everything very easy on me, and I wandered away with almost too much wood for the car this time. Oak, ash, poplar and walnut, almost eight cubic feet of the stuff in total (which is a lot more than it sounds when it’s in the form of 16′ long 1″ thick boards).… Read the rest

Read More

More resawing prep…

Spent this evening’s hour in the shed getting the next four laths ready for the resawing by ripping them out of the prepped plank from yesterday.

img_9704a

It’s a tad finicky making a long rip in a board with a ryoba saw, at least on the initial setup. I mean, once the saw is established in the groove and the board is upright, it can tend to track like a laser down the board (unless it hits a knot at a glancing angle); but if that initial inch or so is off-line, then the saw wants to keep going in that initial incorrect direction and it can be a pain to correct because the teeth at the other side of the ryoba will dig in if you turn the blade even a little and the lack of any set means the kerf is nice and thin but it also means you have no room to turn the blade.… Read the rest

Read More

Cleaning up

Tonight was mostly cleaning down from the weekend. I broke down the jig, saving the screws and while the sharp hammer blow took care of the glued on blocks, it did it by removing the block and the top millimeter of the MDF. Oh well. Have to rebuild it anyway. Need taller blocks and I’ll probably cut a bit of the MDF base off to make a drying form as well (the idea is you bend it on the bending form, let it on that, then take it off, remove the bag and the strap and all that, and then clamp it to the drying form and leave it there for a week to dry and set fully).

Then it was time to start in on the next eight slats for the cot.… Read the rest

Read More